Submit new inquiry for this projectInquiry #1: Can you confirm the roadway type for the (4) new LED Luminaires at Location 1 on electrical sheets E-5 and E-6?
Inquiry submitted 09/11/2023
Response #1:Submitted for consideration.
Response posted 09/11/2023
Response #2:Use Luminaire Type INT L-A on Sheet No. 139, E-6.
Response posted 09/15/2023
Inquiry #2: Sheet IP-6 shows two new 4" Gate Valves. Please provide a bid item if these are needed.
Inquiry submitted 10/17/2023
Response #1:Submitted for consideration.
Response posted 10/17/2023
Response #2:Please refer to Addendum No. 2 dated October 25, 2023.
Response posted 10/25/2023
Inquiry #3: Please confirm which bid item the 2" Electrical Conduit for CNC shall be paid under.
Inquiry submitted 10/20/2023
Response #1:Submitted for consideration.
Response posted 10/20/2023
Response #2:The 2" Electrical Conduit for CNC shall be paid under the bid items indicated on the Irrigation Conduit table on Q-3 Summary of Quantity sheet. A portion will be paid under bid item 208688 - PVC PIPE CONDUIT. The remainder will be paid under the bid item 208738 8" - CORRUGATED HIGH DENSITY POLYTHYLENE PIPE CONDUIT.
Response posted 10/24/2023
Inquiry #4: Regarding the pvc pipe and valves. Is this for reclaimed water? Also, item 60, what size conduit?
Inquiry submitted 10/26/2023
Response #1:Submitted for consideration.
Response posted 10/26/2023
Response #2:Project irrigation includes areas of both potable and recycled water. Irrigation types are identified on Irrigation Plan sheets.
For bid item 208688 - PVC PIPE CONDUIT, please refer to Irrigation Conduit table located on Summary of Quantities Q-3 sheet.
Response posted 10/26/2023
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.