Submit new inquiry for this projectInquiry #1: Traffic Charts G1 through G32 Remarks, If closing #1 lane or #1 and #2 lane the express lanes should be closed. Traffic Chart G33 and G34 are to close the express lanes, which state leave 4 lanes open, the mainline has 5 & 6 lanes which does not allow work to be safely performed in the #2 lane.
Traffic Charts G1 through G32 when closing from the slow side allows the closer of all lanes except the #1 lane open which also does not allow for work to be safely performed in the #2 lane.
Please Advise?
Inquiry submitted 10/25/2024
Response #1:Will be addressed in an addendum
Response posted 10/31/2024
Inquiry #2: Per Traffic Charts G1 through G32 when closing #1 or the #1 and #2 lanes you need to close the Express lanes per Charts G33 and G34 which states you must leave 4 lanes open, there are 5 and 6 lanes for the mainline, work cannot be performed safely in the #2 lane.
Per Traffic Charts G1 through G32 when closing from the slow side you are required to leave the #1 lane open which work cannot be safely performed in the #2 lane.
Please advise.
Inquiry submitted 10/29/2024
Response #1:Will be addressed in an addendum
Response posted 10/31/2024
Inquiry #3: What is the depth installation for gravel mulch? No detail is provided.
Inquiry submitted 10/30/2024
Response #1:Will be addressed in an addendum
Response posted 10/31/2024
Inquiry #4: Per Caltrans special provisions section 12-4.02C(7)(b), A Stationary Impact Attenuator Vehicle is required on the project. This has previously been a bid item on other projects, please provide a bid item.
Inquiry submitted 11/04/2024
Response #1:Addendum will be issued
Response posted 11/19/2024
Inquiry #5: Please confirm the quantity for LCB-RS.
Im comin up with about 800cy difference.
Inquiry submitted 11/21/2024
Response #1:Design has verified and is comfortable with the quantity as shown
Response posted 11/25/2024
Inquiry #6: Addendum 1, issued on 10/31/2024, stated that an addendum would follow with additional changes. Please confirm when the next addendum will be available for review. Due to the upcoming holiday, there is limited time for contractors and subcontractors, including DBE firms, to review an addendum and incorporate changes into the bid. If Caltrans intends to extend the bid date, please notify Bidders as soon as possible.
Inquiry submitted 11/22/2024
Response #1:Addendum 2 is scheduled to be issued on November 27, 2024.
Response posted 11/25/2024
Inquiry #7: There is no designated line item on the bid form for new RCVM or FLOW SENSOR assemblies; please advise where these are to be paid for.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #8: With regard to irrigation FLOW SENSOR assemblies, the number of assemblies shown on the drawings conflicts with direction provided in the special provisions (refer to irrigation materials list provided in Section 20-2.06B(2)(a). Similarly, the number or sensor decoders expressed differs from the quantity of assemblies shown on the drawings. Advise how we are to bid, and amend the bid form to reconcile intended scope items and quantities.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #9: Refer to irrigation plan sheets IP-3 and IP-4 where on sheet IP-3 the "L" valve system extends to sheet IP-4, valves on this sheet are labeled "D", but there is no corresponding "D" controller identified on the documents. Advise if the remote control valves shown on IP-4 and identified as "D" systems are to be connected to the "L" controller system shown on sheet IP-3
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #10: Irrigation Quantity Chart (Main Supply Side of Control Valve) indicates a proposed 3" remote control valve for irrigation Sheet IP-9, this valve is not shown on the current drawing. Please advise if this is to be included or remove from the documents.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #11: Irrigation gate valves without specified sizes, where shown shall be bid as line size unless otherwise advised. (Refer to irrigation sheets IP-2 and IP-4) each has proposed gate valve symbols without size callouts.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #12: Please provide material specification for SOIL AMENDMENT; advise if nitrolized fir would be an acceptable material for bidding purposes.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #13: Provide material specification for WOOD MULCH; advise if Shredded Mulch or Wood Chips will be required for this contract.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #14: Refer to irrigation plan sheets IP-3 and IP-4 on the uppermost portion of the match-line near the architects stamp. There appears to be a lapse in continuity for the irrigation mainline system here, advise where the mainline shown on IP-4 is to continue on IP-3 or revise the drawings accordingly.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #15: Please indicate the flow rates for GEAR ROTOR #5 similar to the flow rates indicated for other rotary heads (#8 and #7) in order to calculate correct sizes and quantities of irrigation lateral lines where these sprinklers are indicated.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #16: Please consider using a different symbol to define the use of GSP as it relates to the irrigation system. There is no clear distinction or separation of where PVC and GSP stop and start. Location of GSP will impact how the item is bid and materials are calculated.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #17: Refer to irrigation plan sheet IP-4 in the landscape area within the vicinity of remote control valve callout A-20; there is no proposed irrigation in an area approximately 30,000 square feet which includes new 1 gallon Myoporum plantings on the corresponding planting plan sheet PP-4. Advise how these plants are to receive watering or revised irrigation sheet IP-4 to provide the needed sprinkler coverage.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #18: Pop-up sprinkler assemblies per bid item #53 are indicated as single symbols and there is no reference designating a factor that would multiply the symbol to arrive at a final quantity. The takeoff of actual symbols is exactly half of the stated bid quantity. Advise if this is correct or if in fact the symbol is to be multiplied by a factor of (2) for each symbol shown on the plans.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #19: Bid item #36 provides for maintenance of existing plantings, the drawings however do not indicate as is typical limits of any existing plantings that are to be maintained throughout the life of the contract. Please define the areas of MEPA for bidding purposes.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #20: Bid item #38 GRAVEL MULCH does not provide detail or the depth of material to be applied where gravel mulch is shown on the plans. Please include a detail and depth of material for all gravel mulch areas proposed.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #21: Refer to bid item #50 TREE WELL SPRINKLER ASSEMBLY; where these are shown on plans, does not correlate to locations of proposed tree plantings. Separately, there is no legend or material criteria specified for these assemblies, please update the irrigation drawings, legend and bid form quantity to reconcile.
Inquiry submitted 11/27/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #22: Refer to special provision 20-2.06B(2)(a), the Equipment description in the table provides Armored-Clad 2-WIRE model CAB14-R. However, this model is not an armored-clad type (no steel tape to meet Caltrans standard specification). Furthermore, on irrigation plan, irrigation control and neutral conductor symbol does not have 'ACC' letter on it. Bid item #0041 for conductor does not indicate 'armored-clad' as well. Please confirm irrigation conductor required for this project is not armored-clad. Otherwise, please provide the correct model for armored-clad conductor and revised irrigation plans that reflect 'ACC' Conductor symbol if necessary.
Inquiry submitted 11/28/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #23: Refer to sheet IP-6 and PP-6: new planting area at existing control valves A-28 to A-37 is divided into (2) parts, (1) part are served by existing irrigation, (1) part above at Class 2 aggregate base maintenance vehicle access road is not served with either existing or new irrigation system. Please provide irrigation for this area.
Inquiry submitted 11/28/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #24: Refer to sheet IP-3, at S605-W22 Conn/ ''XB-3'' Line, Station 61+71, there is a new Class 315 supply line symbol inside existing 10'' WSP with existing 2-1/2'' GSP. Please confirm no new Class 316 supply is included in the existing 10'' conduit.
Similarly, there is new sprinkler control conductor symbol in this existing conduit with does not connect to any valves of controller 'G' and 'L'. Confirm wire in this existing 10'' conduit is not necessary.
Inquiry submitted 11/28/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #25: Refer to sheet IP-3, there is no sprinkler control conductor continuation for valves G-1 to G-10 to sheet IP-9. Please revise sheet IP-3 with the missing wire continuation, approximate 350 linear feet, at station 61+71 to match line with IP-9.
Inquiry submitted 11/28/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #26: Refer to sheet IP-2, there are (2) 3'' RCVMF - master valve with flow sensor for controller 'K' and 'L' on SB Route 405. Please confirm if each RCVMF is a separate master valve and a flow sensor or a hydrometer valve - a combination of master valve and flow sensor. If it is a hydrometer, please specify the desirable model as there is no technical specification for hydrometer in Caltrans Standard Specification.
Inquiry submitted 11/29/2024
Response #1:Bid as is
Response posted 12/03/2024
Inquiry #27: In Addendum 2 the G1 through G34 traffic charts are the same as in the original traffic charts in the specials provisions for the project, please provide traffic charts that will allow work to be performed safely in the #2 lane. Please advise?
Inquiry submitted 12/02/2024
Response #1:Chart No. G33 was revised to allow additional lane closures.
Response posted 12/02/2024
Inquiry #28: In Inquiry #27: In Addendum 2 the G1 through G34 traffic charts are the same as in the original traffic charts in the specials provisions for the project, please provide traffic charts that will allow work to be performed safely in the #2 lane.
The Response #1:Chart No. G33 was revised to allow additional lane closures. G33 applies to the SB 405 will Chart G34 be revised to allow work in the NB 405 #2 lane? Please advise?
Inquiry submitted 12/03/2024
Response #1:Chart No. G34 applies to the NB 405 Express Lanes Entrance at postmile 8.7. There is no pavement work at this location.
Response posted 12/03/2024
The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.