Inquiry #1: Request to add on optional construction joint between the concrete barrier and 10" concrete barrier footing.
Inquiry submitted 05/27/2025

Response #1:Bid as is
Response posted 05/28/2025




Inquiry #2: Sheet C-1 shows 10' of the Cable Railing going into the Concrete Barrier Transition.

There is no detail for this insert and would be much more cost effective to not include this cable railing.

What is the states intent with this?

Please Advise.

Inquiry submitted 05/28/2025

Response #1:Bid as is
Response posted 05/29/2025




Inquiry #3: Is it the State's intent to complete all the asphalt and concrete paving in one 10-hour shift? No extended closures? Please advise
Inquiry submitted 05/29/2025

Response #1:Bid as is
Response posted 05/29/2025




Inquiry #4: The profile on sheet 7 shows a grade difference as much as 1 foot between the original connector grade and the new finish grade. If the paving operations for either the asphalt or JPCP were done in sections, how would traffic transition from the existing grades to the new pavement.

We believe the State is missing staging plans to complete the work safely.

Please advise.

Inquiry submitted 05/30/2025

Response #1:Bid as is
Response posted 06/02/2025




Inquiry #5: Section C-C on Sheet 11 misrepresents the existing field conditions to bury the ADL material. The existing condition is a 2:1 slope which would require extensive shoring to be placed to allow the placement of the ADL material as shown. If this is the intent, the contractor would need a traffic plan on Miraloma Ave. Please advise.
Inquiry submitted 06/02/2025

Response #1:Bid as is
Response posted 06/02/2025


The information provided in the responses to bidder inquiries is not a waiver of Section 2-1.07, "JOB SITE AND DOCUMENT EXAMINATION" of the Standard Specifications or any other provision of the contract, nor to excuse the contractor from full compliance with the contract. Bidders are cautioned that subsequent responses or contract addenda may change a previous response.