Search Results: Planholders

Listing for all primes seeking assistance with project 04-0P9704.

2 records found



Contractor: Bridgeway Civil Constructors, Inc. Contact: Gabe Farncroft
Address: 3333 Vaca Valley Parkway, Suite 2000B Vacaville, CA, 95688
Phone: 707-455-7033 Fax: 707-455-7036 Email: gfarncroft@bridgewaycci.com
Services needed: Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE/SBE firms to perform commercially useful functions for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (WDAY), DISPUTE RESOLUTION ADVISOR ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION- ADVISOR-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMPORARY PAVEMENT MARKER, TEMPORARY BARRIER SYSTEM, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN (EA), TEMPORARY CRASH CUSHION (EA), TEMPORARY CRASH CUSHION TL-2, TEMPORARY CRASH CUSHION TL-3, TEMPORARY TRAFFIC SCREEN, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), NOISE MONITORING, REMOVE CONCRETE (VEGETATION CONTROL), TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY TREE PROTECTION, CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION (TYPE R-1) (AERIALLY DEPOSITED LEAD), (F) - STRUCTURE EXCAVATION (BRIDGE), (F) - STRUCTURE BACKFILL (BRIDGE), IMPORTED BORROW (CY), RESET TREE GRATE, RELOCATE TREE GRATE, REMOVE TREE GRATE, RESET TRASH RECEPTACLE, MOVE-IN/MOVE-OUT (EROSION CONTROL), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), HOT MIX ASPHALT (BRIDGE), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, (F) - STRUCTURAL CONCRETE, BRIDGE, (F) - STRUCTURAL CONCRETE, BARRIER SLAB, (F) - STRUCTURAL CONCRETE, DRAINAGE INLET, DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1/2"), JOINT SEAL (MR 1"), JOINT SEAL (MR 1 1/2"), (F) - BAR REINFORCING STEEL (BRIDGE), (F) - FURNISH SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY), (F) - INSTALL SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY), REMOVE BRIDGE MOUNTED SIGN, REMOVE ASPHALT CONCRETE SURFACING, REFINISH BRIDGE DECK, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, TRASH NET (HEADWALL CONNECTION), 18" CORRUGATED STEEL PIPE (.079" THICK), 18" CORRUGATED STEEL PIPE DOWNDRAIN (.079" THICK), ANCHOR ASSEMBLY, 18" CORRUGATED STEEL PIPE ENERGY DISSIPATOR (.064" THICK), REMOVE CULVERT (LF), REMOVE INLET, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MINOR CONCRETE (CURB AND GUTTER), REMOVE CONCRETE (CURB AND GUTTER), (F) - MISCELLANEOUS IRON AND STEEL, (F) - MISCELLANEOUS METAL (BRIDGE), ADJUST MANHOLE FRAME AND COVER (UTILITY), REMOVE AND REPLACE MONUMENT, RESET BIKE RACK, RESET DRINKING FOUNTAIN, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, CONCRETE BARRIER MARKER, OBJECT MARKER (TYPE L-1), RESET ROADSIDE SIGN, RELOCATE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), ROADSIDE SIGN - ONE POST, INSTALL SIGN (ACRYLIC FOAM TAPE METHOD), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), (F) - CHAIN LINK RAILING (TYPE 6), TRANSITION RAILING (TYPE AGT), ALTERNATIVE IN-LINE TERMINAL TL-3, (F) - CONCRETE BARRIER (TYPE 732SW MODIFIED), (F) - CONCRETE BARRIER (TYPE 85 MODIFIED), (F) - CONCRETE BARRIER (TYPE 85B MODIFIED), SALVAGE GUARDRAIL, REMOVE CONCRETE BARRIER, REMOVE PAVEMENT MARKING, REMOVE THERMOPLASTIC TRAFFIC STRIPE, 12" TRAFFIC STRIPE TAPE (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 18-12), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 8-4), MODIFYING LIGHTING SYSTEMS (CITY), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, MOBILIZATION
Requirements: All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors. Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor’s license, insurance and worker’s compensation coverage meeting Bridgeway’s requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.
Date posted: 06/26/2024
Contractor: Bugler Construction Contact: Glenn Bugler
Address: 4847 Hopyard Road Pleasanton, Ca, 94588
Phone: 925-416-0700 Fax: 925-416-7746 Email: buglerconst@comcast.net
Services needed: Bugler Construction is seeking DVBE & Small Business companies to submit quotes for any scope of work/bid items relevant to this project that they are classified to perform including but not limited to the following: LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, TEMPORARY PAVEMENT MARKER, TEMPORARY BARRIER SYSTEM, TEMPORARY PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY CRASH CUSHION, TEMPORARY TRAFFIC SCREEN, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), NOISE MONITORING, REMOVE CONCRETE (VEGETATION CONTROL), TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY TREE PROTECTION, CLEARING AND GRUBBING, ROADWAY EXCAVATION (AERIALLY DEPOSITED LEAD), STRUCTURE EXCAVATION (BRIDGE), STRUCTURE BACKFILL (BRIDGE), IMPORTED BORROW, RESET TREE GRATE, RELOCATE TREE GRATE, REMOVE TREE GRATE, RESET TRASH RECEPTACLE, ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), HOT MIX ASPHALT (BRIDGE), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, BARRIER SLAB, STRUCTURAL CONCRETE, DRAINAGE INLET, DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1/2"), JOINT SEAL (MR 1"), JOINT SEAL (MR 1 1/2"), BAR REINFORCING STEEL (BRIDGE), FURNISH SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY), INSTALL SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY), REMOVE BRIDGE MOUNTED SIGN, REMOVE ASPHALT CONCRETE SURFACING, REFINISH BRIDGE DECK, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, TRASH NET (HEADWALL CONNECTION), 18" CORRUGATED STEEL PIPE (.079" THICK), 18" CORRUGATED STEEL PIPE DOWNDRAIN (.079" THICK), ANCHOR ASSEMBLY, 18" CORRUGATED STEEL PIPE ENERGY DISSIPATOR (.064" THICK), REMOVE CULVERT, REMOVE INLET, ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MINOR CONCRETE (MISCELLANEOUS CONSTRUCTION), MINOR CONCRETE (CURB AND GUTTER), REMOVE CONCRETE (CURB AND GUTTER), MISCELLANEOUS IRON AND STEEL, MISCELLANEOUS METAL (BRIDGE), ADJUST MANHOLE FRAME AND COVER (UTILITY), REMOVE AND REPLACE MONUMENT, RESET BIKE RACK, RESET DRINKING FOUNTAIN, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), TREATMENT BEST MANAGEMENT PRACTICE MARKER, CONCRETE BARRIER MARKER, OBJECT MARKER (TYPE L-1), RESET ROADSIDE SIGN, RELOCATE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), ROADSIDE SIGN - ONE POST, INSTALL SIGN (ACRYLIC FOAM TAPE METHOD), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), CHAIN LINK RAILING (TYPE 6), TRANSITION RAILING (TYPE AGT), ALTERNATIVE IN-LINE TERMINAL TL-3, CONCRETE BARRIER (TYPE 732SW MODIFIED), CONCRETE BARRIER (TYPE 85 MODIFIED), CONCRETE BARRIER (TYPE 85B MODIFIED), SALVAGE GUARDRAIL, REMOVE CONCRETE BARRIER, REMOVE PAVEMENT MARKING, REMOVE THERMOPLASTIC TRAFFIC STRIPE, 12" TRAFFIC STRIPE TAPE (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 18-12), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 8-4), MODIFYING LIGHTING SYSTEMS (CITY), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION In addition to the listed bid items, Bugler Construction is seeking quotes for construction rentals, miscellaneous construction supplies, and trucking rates. We will consider subcontracting any scopes of work quoted by interested companies.
Requirements: Bugler Construction is actively seeking subcontractors and suppliers on this project. Subcontractors must possess a valid California Contractors License and have current registration with the State Department of Industrial Relations. Subcontractors must be able to provide current general commercial liability insurance, workers compensation insurance and be prepared to provide payment and performance bonds. Bugler will pay the cost of bonds up to 2.0% of total subcontract for bonds issued by a California admitted surety that is acceptable to Bugler Construction. Bugler will assist in obtaining insurance, bonds, lines of credit, supplies, materials and equipment. Plans and Specification can be viewed by appointment at our Pleasanton Office, sent electronically upon request, or viewed on the Caltrans Website. Bugler Construction is signatory to the operators, laborers, cement mason and carpenters unions and subcontractors will need to be signatory or sign a project labor agreement with appropriate unions.
Date posted: 06/26/2024