Search Results: Planholders

Listing for all primes seeking assistance with project 04-155004.

9 records found



Contractor: St Francis Electric Contact: Edgar Murillo
Address: 1001 Carden Street San Leandro CA 94577
Phone: 510-639-0639 Fax: 510-639-9116 Email: emurillo@sfe-inc.com
Services needed: 0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 530 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 14 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTION-BOARD-RELATED TASKS HR 80 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 200 0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 500 0010 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 20 0011 129015 MOBILE BARRIER SYSTEM DAY 450 0012 129016 MOBILE BARRIER TRAILER MO 42 0013 130100 JOB SITE MANAGEMENT LS LUMP SUM 0014 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0015 130331 STORMWATER ANNUAL REPORT EA 3 0016 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 490 0017 130730 STREET SWEEPING LS LUMP SUM 0018 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0019 141110 WORK AREA MONITORING (BRIDGE) LS LUMP SUM 0020 148005 NOISE MONITORING LS LUMP SUM 0021 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 3,200 0022 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM 0023 200002 ROADSIDE CLEARING LS LUMP SUM 0024 205035 WOOD MULCH CY 8,210 0025 206400 CHECK AND TEST EXISTING IRRIGATION FACILITIES LS LUMP SUM 0026 206405 REMOVE IRRIGATION FACILITY LS LUMP SUM 0027 206560 CONTROL AND NEUTRAL CONDUCTORS LS LUMP SUM 0028 206562 1" REMOTE CONTROL VALVE EA 9 0029 206564 1 1/2" REMOTE CONTROL VALVE EA 10 0030 206631 1" WYE STRAINER ASSEMBLY EA 1 0031 206632 1 1/4" WYE STRAINER ASSEMBLY EA 1 0032 206633 1 1/2" WYE STRAINER ASSEMBLY EA 2 0033 206634 2" WYE STRAINER ASSEMBLY EA 6 0034 208447 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 21 0035 208448 RISER SPRINKLER ASSEMBLY EA 53 0036 208574 1 1/2" GATE VALVE EA 3 0037 208575 2" GATE VALVE EA 2 0038 208576 2 1/2" GATE VALVE EA 1 0039 208588 3" GATE VALVE EA 2 0040 208594 (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 585 0041 208595 (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,886 0042 208596 (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 585 0043 208597 (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 32 0044 208598 (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,468 0045 208606 (F) - 2 1/2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 1,560 0046 208607 (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 2,515 0047 208684 1" BALL VALVE EA 3 0048 208685 1 1/2" BALL VALVE EA 2 0049 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 10 0050 210300 HYDROMULCH SQFT 671,000 0051 210350 FIBER ROLLS LF 129,000 0052 210630 INCORPORATE MATERIALS SQFT 15,000 0053 390132 HOT MIX ASPHALT (TYPE A) TON 850 0054 397005 TACK COAT TON 1 0055 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 350 0056 600064 CORE CONCRETE (2") LF 2 0057 600069 CORE CONCRETE (7") LF 18.3 0058 600091 ACCESS OPENING, SOFFIT EA 2 0059 600115 BRIDGE REMOVAL (PORTION), LOCATION A LS LUMP SUM 0060 600116 BRIDGE REMOVAL (PORTION), LOCATION B LS LUMP SUM 0061 600117 BRIDGE REMOVAL (PORTION), LOCATION C LS LUMP SUM 0062 750500 (F) - MISCELLANEOUS METAL LB 66,640 0063 750501 (F) - MISCELLANEOUS METAL (BRIDGE) LB 1,362 0064 870009 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS LUMP SUM 0065 017905 TECHNOLOGY REFRESH LS LUMP SUM 0066 017906 MODIFYING EXISTING ELECTRICAL SYSTEMS LS LUMP SUM 0067 999990 MOBILIZATION LS LUMP SUM
Requirements: We are encouraging quotes from all DBE Subcontractors, Suppliers and Truckers. SFE is willing to breakout any portion of work to encourage DBE participation. St. Francis Electric, LLC. is an equal opportunity employer. We do not discriminate against any subcontractors, vendors, or employees regardless of sex, age, religion, race, sexual orientation, marital status, national origin, military service disabilities, creed, or national origin. If you need any assistance, feel free to contact us with any questions.
Date posted: 05/12/2025
Contractor: San Francisco Builders Exchange Contact: Deanna Johnson
Address: 850 S Van Ness Ave San Francisco, CA 94110
Phone: 415-282-8220 Fax: 415-821-0363 Email: djohnsonsf@sbcglobal.net
Services needed:
Requirements:
Date posted: 05/12/2025
Contractor: Anvil Builders Inc Contact: Ellie Cardona
Address: 1550 Park Ave Emeryville, CA 94608
Phone: 415-285-5000 Fax: 415-285-5005 Email: estimating@anvilbuilders.com
Services needed: Anvil Builders is requesting quotes from all qualified subcontractors and suppliers, including certified DBE firms for the following items of work: LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE. TIME-RELATED OVERHEAD (WDAY), DISPUTE RESOLUTION BOARD ON-SITE MEETING,HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS,CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM,STATIONARY IMPACT ATTENUATOR VEHICLE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN (EA),MOBILE BARRIER SYSTEM, MOBILE BARRIER TRAILER, JOB SITE MANAGEMENT, STORMWATER POLLUTION PREVENTION PLAN, STORMWATER ANNUAL REPORT, TEMPORARY DRAINAGE INLET PROTECTION, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WORK AREA MONITORING (BRIDGE), NOISE MONITORING, TEMPORARY HIGH-VISIBILITY FENCE, CLEARING AND GRUBBING (LS), ROADSIDE CLEARING, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1" REMOTE CONTROL VALVE, 1 1/2" REMOTE CONTROL VALVE, 1" WYE STRAINER ASSEMBLY, 1 1/4" WYE STRAINER ASSEMBLY, 1 1/2" WYE STRAINER ASSEMBLY, 2" WYE STRAINER ASSEMBLY, POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), RISER SPRINKLER ASSEMBLY, 1 1/2" GATE VALVE, 2" GATE VALVE, 2 1/2" GATE VALVE, 3" GATE VALVE, (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), (F) - 2 1/2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 1" BALL VALVE, 1 1/2" BALL VALVE, MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDROMULCH, FIBER ROLLS, INCORPORATE MATERIALS, HOT MIX ASPHALT (TYPE A), TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, CORE CONCRETE (2"), CORE CONCRETE (7"), ACCESS OPENING (SOFFIT), BRIDGE REMOVAL (PORTION), LOCATION A,BRIDGE REMOVAL (PORTION), LOCATION B, BRIDGE REMOVAL (PORTION), LOCATION C, MISCELLANEOUS METAL, MISCELLANEOUS METAL (BRIDGE), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, TECHNOLOGY REFRESH, MODIFYING EXISTING ELECTRICAL SYSTEMS, MOBILIZATION
Requirements: All quotes should be sent via email to estimating@anvilbuilders.com . Quotes not received by 1:00 PM on bid day may not be reviewed/evaluated. Requirements: Firms must possess & provide current contractor’s license number & DIR Registration number on the quote. No Contractor or Subcontractor shall be qualified to bid on, be listed in a bid proposal or engage in the performance of any contract for public work, unless currently registered to perform public work with the Dept of Industrial Relations. Anvil Builders is signatory to operating engineers, laborers, and carpenters unions. 100% performance and payment bonds may be required for the full amount of subcontract price, please provide a bond premium % listed on your bid. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors# . In addition to bonding assistance, subcontractors are encouraged to contact Anvil Builders with questions regarding obtaining lines of credit, insurance, equipment, materials and/or supplies, or with any questions you may have. Subcontractors will be required to enter into our standard contract. DBE Subcontractors must be listed by the CUCP for the work code(s) that apply to the scope of work they are quoting. Anvil Builders will break down items of work to facilitate DBE participation. Anvil Builders intends to work cooperatively with all qualified DBE firms seeking work on this project. Anvil Builders is an Equal Opportunity Employer.
Date posted: 05/13/2025
Contractor: CONTROLS SYSTEMS CONSULTING CORP Contact: ALBERT RUSSELL
Address: 5720 CALIFORNIA AVE UNIUT 200 IRVINE,CA, 92614
Phone: 949-849-7050 Fax: Email: ALBERTR@CONSYSCORP.COM
Services needed: To: Prime Contractors: We offer comprehensive expertise in Design, Drawing, Design review, Quality Control, Data Sheet, and Submittal Support for Full Electrical Systems—including: Power, Low Voltage, Controls, Network, Modify Traffic Monitoring Station/Electronic Toll, Modify Signal & Lighting, Modify Lighting, Ramp Metering System, Electrical, Fiber Optic Cable System, Roadside Signs, Drainage Pumping Equipment, Pumping Plant Electrical Equipment, Temporary Traffic Screen, are Traffic Control System. We are certified as a Small Business (SB), Microbusiness (MB), and Disadvantaged Business Enterprise (DBE), among others. Please Contact Us for any quote, request and information: ALBERT RUSSELL, phone: 949 849 7050 Email: ALBERTR@CONSYSCORP.COM
Requirements: To: Prime Contractors: We offer comprehensive expertise in Design, Drawing, Design review, Quality Control, Data Sheet, and Submittal Support for Full Electrical Systems—including: Power, Low Voltage, Controls, Network, Modify Traffic Monitoring Station/Electronic Toll, Modify Signal & Lighting, Modify Lighting, Ramp Metering System, Electrical, Fiber Optic Cable System, Roadside Signs, Drainage Pumping Equipment, Pumping Plant Electrical Equipment, Temporary Traffic Screen, are Traffic Control System. We are certified as a Small Business (SB), Microbusiness (MB), and Disadvantaged Business Enterprise (DBE), among others. Please Contact Us for any quote, request and information: ALBERT RUSSELL, phone: 949 849 7050 Email: ALBERTR@CONSYSCORP.COM
Date posted: 05/17/2025
Contractor: American Civil Constructors West Coast LLC Contact: Estimating
Address: 2990 Bay Vista Court Benicia CA 94510
Phone: 707-746-8028 Fax: 707-747-0593 Email: bids@accbuilt.com
Services needed: ACC West Coast would like to encourage all DBE companies whom are classified to perform any of the scopes of work relevant to this project to submit quotes. We are currently requesting quotes for all scopes of work and bid items related to this project. Please see the list of bid items associated with this project for more information. Other items of work in which quotes are greatly desired: Construction Rentals, Misc. Construction Supplies, Flat-Bed and End Dump Hourly Trucking Rates. We will also consider subcontracting other scopes of work offered by interested companies.
Requirements: ACC will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Please call to discuss how ACC West Coast can assist you in your bonding, credit and/or insurance needs. Assistance may include, but is not limited to: Contacting bonding and/or insurance companies on your behalf, arranging with sureties incremental or phased bonding, obtaining necessary equipment, supplies and/or materials. Subcontractors may be required to provide a bond and must have a valid contractor’s license and current insurance coverage that meets ACC and project requirements. Selected subcontractors will be required to sign our standard subcontractor agreement. Please email or fax quotes no later than 10:00am on bid day. If you have any questions, please contact the project estimator. Plans and Specifications may be viewed at our Benicia office. Quotes must include inclusions and exclusions, and must be valid for a minimum of 60 days following the bid date. ACC is an equal opportunity employer.
Date posted: 05/19/2025
Contractor: George Reed, Inc. Contact: Adam Hanson
Address: P.O. BOX 4760 Modesto, CA 95352
Phone: 209-523-0734 Fax: 209-523-4927 Email: estimating@georgereed.com
Services needed:
Requirements:
Date posted: 05/27/2025
Contractor: 2M General Engineering, Inc. Contact: Chris Post
Address: 1980 S River Rd, Suite F West Sacramento, Ca, 95691
Phone: 916-237-7445 Fax: Email: estimating@2mgeneral.com
Services needed: ATTENTION PRIMES: We offer Utility Locating, Potholing, and Excavation Services • Hydro Excavation (Potholing & Utility Verification) • Utility Locating & Marking (Private & Public Utilities) • Ground Penetrating Radar (GPR) • Pre/Post Surveying & GIS Mapping • Subsurface Utility Engineering (SUE) – ASCE 38-22 & 75-22 • Slot Trenching & Excavation • Concrete Coring & Saw Cutting • Backfilling 2M General Engineering specializes in utility investigations for public infrastructure projects, ensuring compliance with Caltrans standards. We provide precise, efficient, and safety-focused excavation and locating services to support roadway, bridge, and infrastructure development projects. Our team is SBE-certified and deeply experienced in working on Caltrans projects across multiple districts. 2M General Engineering, Inc. estimating@2mgeneral.com
Requirements:
Date posted: 05/28/2025
Contractor: Teichert Energy & Utilities Group, Inc, dba Teichert Utilities Contact: Butch Fund
Address: 8811 Kiefer Boulevard Sacramento, CA 95826
Phone: 916-438-8500 Fax: Email: estimating@teichert.com
Services needed: Teichert Utilities is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM RESET, ADJUST ROADWAY ITEMS PLANE ASPHALT CONCRETE REMOVE BRIDGE ITEM MODIFY BRIDGE ITEM CLEARING & GRUBBING ROADWAY EXCAVATION GRADING HIGHWAY PLANTING SOIL AMENDMENTS HYDROSEEDING EROSION CONTROL IRRIGATION SYSTEM TEMPORARY EROSION CONTROL AGGREGATE BASE ASPHALT CONCRETE PAVING ASPHALT (ASPHALT CONCRETE) PLACE ASPHALT CONCRETE DIKE & MISC PORTLAND CEMENT & CONCRETE PAVEMENT CLEAN & SEAL PAVEMENT JOINTS – ROUT & SEAL CRACKS GROOVE & GRIND PAVEMENT STEEL STRUCTURES SIGN STRUCTURE ROADSIDE SIGN SAW CUTTING THERMOPLASTIC TRAFFIC STRIPING & MARKING PAINTED TRAFFIC STRIPING & MARKING PAVEMENT MARKING SIGNAL & LIGHTING SIGNAL LIGHTING MESSAGE SIGNS, LIGHTING & SIGN ILLUMINATION CRANE WORK COMMERICAL ELECTRICAL LOW VOLTAGE SYSTEMS LANDSCAPING CONTRACTOR ASBESTOS REMOVAL/ABATEMENT CORING CUTTING SANDBLASTING CONSTRUCTION EQUIPMENT RENTAL HEAVY EQUIPMENT RENTAL DEMOLITION SAFETY EQUIPMENT SUPPLIER LANDSCAPING & NURSERY SUPPLIER LANDSCAPING MATERIALS SUPPLIER PETROLEUM, OIL, LUBRICANTS SUPPLIER (BULK ITEM) SAND & GRAVEL SUPPLIER (BULK ITEM) ASPHALT SUPPLIER(BULK ITEM) CONCRETE & CEMENT SUPPLIER(BULK ITEM) ELECTRICAL & SIGNALS SUPPLIER WHOLESALE BROKER OF CONSTRUCTION MATERIALS (No Inventory) BROKER LEAD COMPLIANCE SWPPP PLANNING BOTTOM DUMP TRUCK TRANSFER DUMP TRUCK SUPER 10 DUMP TRUCK FLAT BED TRUCKING WATER TRUCK END DUMP TRUCK ASPHALT OIL TANKERS STREET SWEEPING TRUCK HAZARDOUS SUBSTANCE REMOVAL HAZARDOUS WASTE TRUCKING TRUCK RENTAL TRUCKER BROKER and TRUCKER.
Requirements: Teichert Utilities intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert’s Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Utilities is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED.
Date posted: 05/28/2025
Contractor: MP Nexlevel of California, Inc. Contact: David Hill
Address: 266 Industrial Blvd., Suite B San Carlos, CA 94070
Phone: 650-272-7915 Fax: 650-412-1844 Email: mpnl-all-contractsdept@mpnexlevel.us
Services needed: 0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 530 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 14 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS HR 80 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120103 STATIONARY IMPACT ATTENUATOR VEHICLE DAY 200 0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 500 0010 128651 PORTABLE CHANGEABLE MESSAGE SIGN (EA) EA 20 0011 129015 MOBILE BARRIER SYSTEM DAY 450 0012 129016 MOBILE BARRIER TRAILER MO 42 0013 130100 JOB SITE MANAGEMENT LS LUMP SUM 0014 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0015 130331 STORMWATER ANNUAL REPORT EA 3 0016 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 490 0017 130730 STREET SWEEPING LS LUMP SUM 0018 130900 TEMPORARY CONCRETE WASHOUT LS LUMP SUM 0019 141110 WORK AREA MONITORING (BRIDGE) LS LUMP SUM 0020 148005 NOISE MONITORING LS LUMP SUM Item No. Item Code Item Description Unit of Measure Estimated Quantity 0021 160110 TEMPORARY HIGH-VISIBILITY FENCE LF 3,200 0022 170103 CLEARING AND GRUBBING (LS) LS LUMP SUM 0023 200002 ROADSIDE CLEARING LS LUMP SUM 0024 205035 WOOD MULCH CY 8,210 0025 206400 CHECK AND TEST EXISTING IRRIGATION FACILITIES LS LUMP SUM 0026 206405 REMOVE IRRIGATION FACILITY LS LUMP SUM 0027 206560 CONTROL AND NEUTRAL CONDUCTORS LS LUMP SUM 0028 206562 1" REMOTE CONTROL VALVE EA 9 0029 206564 1 1/2" REMOTE CONTROL VALVE EA 10 0030 206631 1" WYE STRAINER ASSEMBLY EA 1 0031 206632 1 1/4" WYE STRAINER ASSEMBLY EA 1 0032 206633 1 1/2" WYE STRAINER ASSEMBLY EA 2 0033 206634 2" WYE STRAINER ASSEMBLY EA 6 0034 208447 POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN) EA 21 0035 208448 RISER SPRINKLER ASSEMBLY EA 53 0036 208574 1 1/2" GATE VALVE EA 3 0037 208575 2" GATE VALVE EA 2 0038 208576 2 1/2" GATE VALVE EA 1 0039 208588 3" GATE VALVE EA 2 0040 208594 (F) - 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 585 Item No. Item Code Item Description Unit of Measure Estimated Quantity 0041 208595 (F) - 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,886 0042 208596 (F) - 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 585 0043 208597 (F) - 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 32 0044 208598 (F) - 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE) LF 1,468 0045 208606 (F) - 2 1/2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 1,560 0046 208607 (F) - 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE) LF 2,515 0047 208684 1" BALL VALVE EA 3 0048 208685 1 1/2" BALL VALVE EA 2 0049 210010 MOVE-IN/MOVE-OUT (EROSION CONTROL) EA 10 0050 210300 HYDROMULCH SQFT 671,000 0051 210350 FIBER ROLLS LF 129,000 0052 210630 INCORPORATE MATERIALS SQFT 15,000 0053 390132 HOT MIX ASPHALT (TYPE A) TON 850 0054 397005 TACK COAT TON 1 0055 398200 COLD PLANE ASPHALT CONCRETE PAVEMENT SQYD 350 0056 600064 CORE CONCRETE (2") LF 2 0057 600069 CORE CONCRETE (7") LF 18.3 0058 600091 ACCESS OPENING, SOFFIT EA 2 0059 600115 BRIDGE REMOVAL (PORTION), LOCATION A LS LUMP SUM 0060 600116 BRIDGE REMOVAL (PORTION), LOCATION B LS LUMP SUM Item No. Item Code Item Description Unit of Measure Estimated Quantity 0061 600117 BRIDGE REMOVAL (PORTION), LOCATION C LS LUMP SUM 0062 750500 (F) - MISCELLANEOUS METAL LB 66,640 0063 750501 (F) - MISCELLANEOUS METAL (BRIDGE) LB 1,362 0064 870009 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION LS LUMP SUM 0065 017905 TECHNOLOGY REFRESH LS LUMP SUM 0066 017906 MODIFYING EXISTING ELECTRICAL SYSTEMS LS LUMP SUM 0067 999990 MOBILIZATION LS LUMP SUM
Requirements: Requesting quotations from all qualified DBE Sub-contractors and Material suppliers performing commercially useful functions. 100% Performance and Payment bonds required. Subcontractors must possess a current contractor's license.
Date posted: 06/05/2025