Search Results: Planholders

Listing for all primes seeking assistance with project 04-2Y4604.

3 records found



Contractor: DeSilva Gates Construction Contact: David Czech
Address: 11555 Dublin Blvd., Dublin, CA 94568
Phone: 925-829-9220 Fax: 925-803-4263 Email: dgcestimating@desilvagates.com
Services needed: DeSilva Gates Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE/SBE/DVBE firms for the following types of work, including but not limited to: Cold Plane, Construction Area Signs, Crack Treatment, Electrical, Erosion Control, HMA Dike, Striping and Pavement Markers, WPCP Prep, Traffic Control, Trucking, Sweeping, Water Trucks, Erosion Control Materials, HMA Material, RHMA Material and Tack Coat Material.
Requirements: DeSilva Gates is signatory to Operating Engineers and Laborers unions. 100% performance and payment bonds may be required for the full amount of subcontract price. DeSilva Gates will pay for bond premium up to 2%. Subcontractors must possess current insurance and worker’s compensation coverage meeting DeSilva Gates Construction’s requirements. Subcontractor will be required to sign the standard DeSilva Gates Construction Subcontract Agreement. A copy of the agreement can be obtained from our estimator. Quotations must be valid for the same duration as specified by the Owner for Contract Award. Plans and specifications are available for viewing at our Dublin office. Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies. DeSilva Gates intends to work cooperatively with all qualified firms seeking work on this project. DeSilva Gates is an equal opportunity employer.
Date posted: 04/24/2024
Contractor: O.C. Jones & Sons, Inc. Contact: Bill Jensen
Address: 1520 Fourth Street Berkeley, CA 94710
Phone: 510-526-3424 Fax: 510-526-0990 Email: bjensen@ocjones.com
Services needed: REQUEST FOR DVBE & SBE SUBCONTRACTORS AND SUPPLIERS We are soliciting quotes for (including but not limited to): Trucking, Temporary and Permanent Hydroseed and Erosion Control Measures, QC/QA Testing, Lead Compliance Plan, Construction Area Signs, Traffic Control System, Stationary Impact Attenuator Vehicle, Portable Radar Speed Feedback Sign System, Portable Changeable Message Sign, Water Pollution Control Program, Sweeping, Noise Monitoring, Crack Treatment, Segment Correction, AC Dike, Tack Coat, Cold Plane AC, Pavement Marker, Striping & Marking, Maintain Existing Traffic Management Elements During Construction, Modify Traffic Monitoring Stations, and Construction Materials
Requirements: Bill Jensen (510-809-3488 bjensen@ocjones.com) is the estimator on this project and is available to provide assistance or answer questions regarding the project scope of work including bid requirements, break out of bid items, plan or spec interpretation, bonding or insurance requirements, and other bid assistance. Plans and specs are available to review at our Berkeley office or can be sent out via Building Connected. Plans are also available under the Advertised Projects tab at the Caltrans website at: http://ppmoe.dot.ca.gov/des/oe/contract-awards-services.html. PDF format quotes should be emailed to the estimator or faxed to 510-526-0990 prior to 12:00 PM on the date of the bid. Quotes from DVBE & SBE Subcontractors, Suppliers and Truckers are highly encouraged. OCJ is willing to breakout any portion of work to encourage DVBE & SBE participation. Subcontractors must possess a current DIR, Contractors License, and insurance and workers compensation coverage including waiver of subrogation. OCJ may require Performance and Payment bonds on subcontracts. OCJ will pay the bond premium up to 2% of the contract value. Please contact OCJ for any assistance required by your firm in obtaining bonding or insurance. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors. Visit the California Access to Capital Program Financing Solutions website for additional resources for your small business - http://www.calbizfinance.org/cal_cert_biz_program.html. OCJ is available to help obtain necessary equipment, material and/or supplies. All subcontractors are required to execute OC Jones’ standard subcontract agreement, comply with all insurance requirements, and name OCJ as additional insured. Copies of our agreement and insurance requirements are available upon request. OCJ is a Union contractor, and we are signatory to the Operating Engineers, Laborers, Teamsters, and Carpenters. OCJ is an Equal Opportunity Employer.
Date posted: 05/02/2024
Contractor: A. Teichert & Sons, Inc. dba Teichert Construction Contact: Jay Maniyar
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 916-757-6400 Fax: 916-757-6499 Email: estimating@teichert.com
Services needed: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DVBE/SBE firms for the following items of work, including but not limited to: all materials, labor and equipment for CONSTRUCTION AREA SIGNS TRAFFIC CONTROL SYSTEM PLANE ASPHALT CONCRETE DUST PALLIATIVE EROSION CONTROL TEMPORARY EROSION CONTROL ASPHALT CONCRETE PAVING ASPHALT (ASPHALT CONCRETE) PLACE ASPHALT CONCRETE DIKE & MISC THERMOPLASTIC TRAFFIC STRIPING & MARKING PAINTED TRAFFIC STRIPING & MARKING PAVEMENT MARKING SIGNAL & LIGHTING SIGNAL LIGHTING CONSTRUCTION EQUIPMENT RENTAL HEAVY EQUIPMENT RENTAL SAFETY EQUIPMENT SUPPLIER ASPHALT SUPPLIER(BULK ITEM) MATERIAL TESTING SERVICES CONSTRUCTION ENGINEERING & INSPECTION SERVICES SWPPP PLANNING BOTTOM DUMP TRUCK TRANSFER DUMP TRUCK SUPER 10 DUMP TRUCK WATER TRUCK END DUMP TRUCK STREET SWEEPING TRUCK TRUCKER BROKER and TRUCKER.
Requirements: Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DVBE/SBE participation. Plans and specifications are available from the municipality listed above and the Teichert’s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DVBE/SBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DVBE/SBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid.
Date posted: 05/03/2024