Search Results: Planholders

Listing for all primes seeking assistance with project 06-0W90U4.

1 record found



Contractor: A. Teichert & Sons, Inc. dba Teichert Construction Contact: Raymond Hernandez
Address: 400 Sunrise Avenue, Suite 300 Roseville, CA 95661
Phone: 916-757-6400 Fax: 916-757-6499 Email: estimating@teichert.com
Services needed: Project Description: Teichert Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: all materials, labor and equipment for CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, RESET, ADJUST ROADWAY ITEMS, PLANE ASPHALT CONCRETE, REMOVE BRIDGE ITEM, MODIFY BRIDGE ITEM, CLEARING & GRUBBING, DUST PALLIATIVE, ROADWAY EXCAVATION, GRADING, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, DITCHES EXCAVATION, EMBANKMENT CONSTRUCTION, IMPORTED BORROW, HIGHWAY PLANTING, SOIL AMENDMENTS, HYDROSEEDING, EROSION CONTROL, IRRIGATION SYSTEM, TEMPORARY EROSION, CONTROL, FINISHING ROADWAY, AGGREGATE BASE, ASPHALT CONCRETE, PLACE ASPHALT CONCRETE DIKE & MISC, RECYCLE, RECLAIM ASPHALT CONCRETE, PORTLAND CEMENT & CONCRETE PAVEMENT, GROOVE & GRIND PAVEMENT, CONCRETE STRUCTURE, MINOR CONCRETE STRUCTURE, CONCRETE SURFACE FINISH, CONCRETE BLOCK & MASONRY RETAINING WALL, JOINT SEAL – WATER STOP, REINFORCING STEEL, ROADSIDE SIGN, ALTERNATIVE PIPE CULVERT, REINFORCED CONCRETE PIPE, CORRUGATED METAL PIPE (CSP), FILTER FABRIC, PERMEABLE MATERIAL, PLASTIC PIPE, SEWER MANHOLE, JUNCTION CHAMBER, ROCK SLOPE PROTECTION, SACKED CONCRETE, CONCRETE CURB & SIDEWALK- MISC, MISC IRON & STEEL FRAME, COVER & GRATE, SAW CUTTING, FENCING, TEMPORARY FENCING, SURVEY OR HISTORICAL MONUMENT, OBJECT MARKER, METAL BEAM GUARD RAILING, METAL RAILING, CONCRETE BARRIER, METAL BEAM BARRIER, THERMOPLASTIC TRAFFIC STRIPING & MARKING, PAINTED TRAFFIC STRIPING & MARKING, PAVEMENT MARKING, SIGNAL & LIGHTING, SIGNAL, LIGHTING, MESSAGE SIGNS, LIGHTING & SIGN ILLUMINATION, DETECTOR, TRAFFIC COUNT STATION, SPEED MONITORING STATION, RAMP METERING SYSTEM, RETAINER WALLS, MASONRY, LANDSCAPING CONTRACTOR, SEWER CONNECTION, CORING, CUTTING, CONSTRUCTION EQUIPMENT RENTAL, HEAVY EQUIPMENT RENTAL, DEMOLITION, LANDSCAPING MATERIALS SUPPLIER, PETROLEUM, OIL, LUBRICANTS SUPPLIER (BULK ITEM), SAND & GRAVEL SUPPLIER (BULK ITEM), ASPHALT SUPPLIER(BULK ITEM), PIPE SUPPLIER, DRAINAGE SYSTEMS SUPPLIER, STORM WATER SYSTEMS SUPPLIER, MATERIAL TESTING SERVICES, CONSTRUCTION ENGINEERING & INSPECTION SERVICES, LEAD COMPLIANCE, SWPPP PLANNING, BOTTOM DUMP TRUCK, TRANSFER DUMP TRUCK, SUPER 10 DUMP TRUCK, FLAT BED TRUCKING, WATER TRUCK, END DUMP TRUCK, ASPHALT OIL TANKERS, STREET SWEEPING TRUCK, TRUCK RENTAL, TRUCKER BROKER and TRUCKER.
Requirements: Teichert Construction intends to work cooperatively with all qualified firms seeking work on this project, including but not limited to breaking out contract work items into economically feasible units to increase overall DBE participation. Plans and specifications are available from the municipality listed above and the Teichert’s Roseville Estimating office. For assistance obtaining or regarding the plans and specifications, please contact the listed Estimator. 100% Payment and Performance Bonds for subcontractors are required. Teichert will pay bond premium up to 2%. Insurance Waiver of subrogation also required. However, certified DBE's are encouraged to contact Teichert and request assistance if they are unable to meet Teichert's standard bonding or insurance requirements. DBE's also are encouraged to contact Teichert for assistance in obtaining lines of credit, equipment, supplies, materials or related assistance or services. Subcontractor, Supplier and Trucker quotes must be valid, at minimum, for the award period stated in the contract documents. Please note that this is a prevailing wage project and Teichert Construction is Union signatory. Subcontractors will be subject to the terms and conditions of Teichert's subcontract and safety documents available at www.teichert.com/for-subcontractors.cfm. Submission of a bid to Teichert will confirm that you have reviewed and accepted Teichert's subcontract form. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing prior to bid. Subcontractor scopes and supplier quotes are required 24 hours prior to bid. Additional information and or assistance to DBE's available from: *** All Subcontractor Quotes must have the Department of Industrial Relations # to be ACCEPTED.
Date posted: 04/25/2024