List of Bid Items
Note: This list is not updated when addenda are issued. For informational purposes only.
Contract Number 03-3G1204
Date Adv.: 04/02/2024
Item No. | Item Code | Item Description | Unit of Measure | Estimated Quantity |
---|---|---|---|---|
0001 | 070030 | LEAD COMPLIANCE PLAN | LS | LUMP SUM |
0002 | 090100 | TIME-RELATED OVERHEAD (WDAY) | WDAY | 30 |
0003 | 120090 | CONSTRUCTION AREA SIGNS | LS | LUMP SUM |
0004 | 120100 | TRAFFIC CONTROL SYSTEM | LS | LUMP SUM |
0005 | 128652 | PORTABLE CHANGEABLE MESSAGE SIGN (LS) | LS | LUMP SUM |
0006 | 129161 | AUTOMATED FLAGGER ASSISTANCE DEVICE DAY | EA | 60 |
0007 | 130100 | JOB SITE MANAGEMENT | LS | LUMP SUM |
0008 | 130301 | STORMWATER POLLUTION PREVENTION PLAN | LS | LUMP SUM |
0009 | 130500 | TEMPORARY EROSION CONTROL BLANKET | SQYD | 30 |
0010 | 130610 | TEMPORARY CHECK DAM | LF | 100 |
0011 | 130620 | TEMPORARY DRAINAGE INLET PROTECTION | EA | 1 |
0012 | 130640 | TEMPORARY FIBER ROLL | LF | 670 |
0013 | 170103 | CLEARING AND GRUBBING (LS) | LS | LUMP SUM |
0014 | 190101 | ROADWAY EXCAVATION | CY | 300 |
0015 | 194001 | DITCH EXCAVATION | CY | 35 |
0016 | 390136 | MINOR HOT MIX ASPHALT | TON | 35 |
0017 | 610300 | (F) - CONCRETE BACKFILL (PIPE TRENCH) | CY | 43 |
0018 | 650012 | 15" REINFORCED CONCRETE PIPE | LF | 110 |
0019 | 650018 | 24" REINFORCED CONCRETE PIPE | LF | 72 |
0020 | 705206 | 24" CONCRETE FLARED END SECTION | EA | 2 |
0021 | 710132 | REMOVE CULVERT (LF) | LF | 180 |
0022 | 710152 | REMOVE HEADWALL | EA | 1 |
0023 | 710360 | CLEANING, INSPECTING, AND PREPARING CULVERT (LF) | LF | 230 |
0024 | 710380 | 18" CURED-IN-PLACE PIPELINER | LF | 45 |
0025 | 710382 | 21" CURED-IN-PLACE PIPELINER | LF | 190 |
0026 | 820110 | MILEPOST MARKER | EA | 2 |
0027 | 820112 | MARKER (CULVERT) | EA | 14 |
0028 | 820220 | REMOVE MARKER | EA | 2 |